U.S. power solutions. A partner through every phase.

Storage & energy integration

Battery energy storage

Integrated BESS transformer solutions for utility-scale storage and high-cycling duty. Turnix connects transformer, inverter, switchgear, protection, and control requirements into coordinated power blocks, with skid-mounted and containerized deployment options.

Integrated transformer range1–20 MVA
Integrated primary voltageUp to 34.5 kV
Inverter-side voltage480–900 V

Turnix technical capabilities

Built for your power requirements.

Transformer & integrated power blocks

Explore the portfolio and configuration options. Turnix’s technical team will help align the equipment with your application, site, and performance requirements.

Integrated BESS transformer platform

The integrated platform is configured for inverter compatibility and modular deployment.

Integrated BESS transformer platform
ParameterTurnix capability
Transformer power range1–20 MVA
Primary voltageUp to 34.5 kV
Secondary voltage480–900 V, inverter-compatible
CoolingONAN / ONAF
Design dutyInverter duty; high-cycling storage applications
Loss / efficiency designEngineered for low losses and efficient operation; guaranteed values established for the selected duty
Package formatsSkid-mounted or containerized
Integrated power blockTransformer, MV/LV switchgear, protection and control panels
Delivery approachFactory-assembled and pre-tested

Additional storage-grid transformer pathway

A separate transformer selection pathway supports higher primary voltage requirements. Its envelope is distinct from the integrated platform above.

Additional storage-grid transformer pathway
ParameterTurnix capability
Transformer range1–10 MVA
Primary voltage range11–69 kV
ConstructionOil-immersed
Electrical functionsVoltage transformation, isolation, impedance matching, harmonic mitigation, and voltage regulation
System coordinationBatteries, power conversion, switchgear, cooling, controls, and fire suppression

Select the right storage architecture

Transformer MVA, battery energy in MWh, and usable AC output are separate design inputs. Turnix coordinates the transformer-only or integrated-storage pathway around the required duty.

Design & configuration

Engineering flexibility.
Application-focused solutions.

Electrical, mechanical, and installation requirements come together in the selected Turnix solution.

High-cycling transformer design

Support storage operating profiles with inverter-duty transformer solutions designed for repeated cycling and efficient operation.

Integrated power blocks

Combine the transformer, MV/LV switchgear, protection, and control panels in a factory-assembled package to reduce site interfaces and installation work.

Flexible deployment

Skid-mounted and containerized options support modular project delivery. Batteries, conversion, cooling, controls, and fire suppression can be coordinated within the wider system scope.

Testing & documentation

Technical confidence.
Through every project stage.

Factory assembly & pre-testing

Integrated packages are factory-assembled and pre-tested, with the equipment schedule and acceptance plan defined for the project.

System interface testing

Coordinate protection, controls, inverter compatibility, and communications. Agree functional acceptance criteria across the transformer and storage system.

Commissioning readiness

Prepare installation interfaces, technical documentation, site acceptance requirements, and operating responsibilities before deployment.

Your project documentation

Turnix coordinates the technical submittals and deliverables needed for equipment review, delivery, and operation.

  • System architecture and component bill of materials
  • Usable-energy, power, and performance guarantee schedule
  • Applicable safety/listing records and test reports
  • Interconnection, controls, and commissioning plan
  • Degradation, warranty, maintenance, and end-of-life scope

Prepare your RFQ

Tell us what your
project needs.

Share the application, electrical duty, and site requirements. We’ll help turn them into a clear equipment scope.

Operating objective

Peak management, backup, renewable integration, export control, or another defined use case.

Capacity & duty

AC kW/MW, usable kWh/MWh, discharge duration, cycle profile, availability objective, and life assumptions.

Grid & controls

Connection voltage, interconnection requirements, operating modes, metering, protection, and EMS/SCADA interfaces.

Site & approval

Location, footprint, environment, fire/access requirements, permitting, and required system documentation.

Applications

Power for your next project.

  • Renewable energy integration
  • Peak demand management
  • Backup power projects

Technical questions.

What is the integrated BESS transformer range?

The integrated platform spans 1–20 MVA, with primary voltage up to 34.5 kV and inverter-compatible secondary voltage from 480–900 V.

Can Turnix support higher primary-voltage storage projects?

A separate 1–10 MVA oil-immersed transformer pathway covers primary voltages from 11–69 kV. Turnix will review the appropriate configuration for your project.

Does a 20 MVA transformer define battery capacity?

No. Transformer apparent power and battery energy capacity are different parameters. Battery MWh, usable output, and operating duration are specified separately.

Your Turnix team

One partner. From selection to service.

Application review, customization, project coordination, and after-sales support.

Portfolio ranges describe available solution pathways. Final rating combinations, availability, certifications, testing, and supply scope are confirmed in the project-specific proposal.

Build your next power project with Turnix.

Connect with our team for equipment selection, engineering coordination, and lifecycle support.

Discuss your project